期刊文献+

VMI系统在汽车零部件仓储配送一体化中的应用研究 被引量:6

Research on the Implement of VMI in the Integrated Inventory-distribution System of Auto Parts
下载PDF
导出
摘要 当前形势下,汽车销售已经进入微利时代,汽车4S店也日益面临严峻的挑战,集团化、规模化已经成为大的发展趋势。仓储配送成本在连锁企业总成本中占有很大的比例,如何降低仓储配送成本,成为各4S店集团当前面临的难点之一。以仓储配送一体化为切入点,引入供应商管理库存概念,以此为基础建立总费用的数学模型,给出简单的算例求解,论证系统的优化将有助于提升企业的竞争力。 Recently,car sales became less profit.4S stores are facing serious challenges.How to reduce the operational cost become more and more important.The VMI theory is analyzed and then established a total cost model.In the last a sample example is given in order to prove that the new system can help the enterprises to enhance their competitiveness.
作者 刘明 吴迪
机构地区 上海交通大学
出处 《科学技术与工程》 2010年第13期3287-3291,共5页 Science Technology and Engineering
关键词 4S店集团 仓储配送一体化 供应商管理库存 4S store group integrated inventory-distribution system vendor managed inventory
  • 相关文献

参考文献4

二级参考文献10

  • 1Beasley J E, Route first - cluster second method for vehicle routing[J], Omega, 1983(1):403.
  • 2Battle M, Ayeehew M A. A genetic algorithm for the vehicle routing problem [J]. Computers & Operations Research, 2003(30):787.
  • 3Pearl J. Heuristics: Intelligent search strategies for computer problem solving[M]. MA: Addison-Wesley, 1984.
  • 4Jordan C,Drexl A.Discrete lotsizing and scheduling by batch sequencing[J].Management Science,1998,44(5):698-713.
  • 5Sarmiento,A.M.Review of integrated analysis of production-distribution systems[J].Institute of Industrial Engineers,1999,33(11):1061-1074.
  • 6Erenguc S.S,Simpson N.C,Vakharia A.J.Integrated production/distribution planning in supply chains:An invited review[J].European Journal of Operational Research,1999,115(2):219-236.
  • 7Bertazzi L,Paletta G,Speranza M.G.Minimizing the total cost in an integrated vendor-managed inventory system[J].Journal of Heuristics,2005,11(5/6):393-419.
  • 8Fumero F.Vercellis C.Synchronized development of production,inventory,and distribution schedules[J].Transportation Science,1999,33(3):330-340.
  • 9Bruggemann W,Jahnke H.The discrete lot-sizing and scheduling problem:complexity and modification for batch availability[J].European Journal of Operational Research,2000,124(3):511-528.
  • 10张铎,张成海.供应链管理及其面临的问题[J].物流技术,1998,17(6):49-51. 被引量:6

共引文献7

同被引文献17

引证文献6

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部