摘要
由于目前国内甲、乙级建筑抗拔桩设计没有成熟的计算公式,因此在某扩建车间抗拔桩基设计、施工中,借鉴国内经验公式,对沉管灌注抗拔桩基进行了创新设计和计算分析,从而验证了该桩基布置方案的可行性,也解决了新、旧车间长约150m基础交错的施工难题。
Currently there isn't any mature formula for the cast-in-place uplift pile of A-grade and B-grade foundation design rank, aiming this problem, during the design and construction of uplift pile in a workshop enlarge project, innovation design and calculation analysis is made on sink pipe cast-in-place uplift, the possibility of the pile arrangement scheme is proved, also the construction difficulties that approximately 150m long interlaced foundation between the enlarged and the old workshop is settled.
出处
《工程质量》
2010年第5期76-78,共3页
Construction Quality