期刊文献+

中国企业实施并行工程的若干特点、问题及解决方法 被引量:1

Studies on Management Practices, Characteristics, Problems and Solutions in Implementation of Concurrent Engineering in Chinese Manufacturing Companies
下载PDF
导出
摘要 基于对我国实施并行工程的若干企业的实际案例调查,分析并总结了我国企业实行并行工程在组织形式、人员选拔、培训、绩效评价和奖酬方法等方面的一些作法、特点和存在的问题,并探讨了解决的措施。 Based on case studies in Chinese manufacturing companies implementing CE, this paper analyzes and summarizes the practices, characteristics and problems in organizational design and human resource management (such as selection and training for team members and leaders, performance evaluation and motivation, etc.) during implementation of CE. At last, the solutions to these problems are put forward and discussed.
作者 陈国权
出处 《高技术通讯》 EI CAS CSCD 1999年第1期7-12,共6页 Chinese High Technology Letters
基金 863计划
关键词 并行工程 中国 企业 人力资源管理 CIMS CE Concurrent Engineering, Chinese company, Organizational design, Human resource management, Performance evaluaton, Motivation, Selection, Training
  • 相关文献

参考文献3

共引文献7

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部