摘要
通过上海华翔路地道雨水泵站设计实例,对汇水面积计算、重现期选择、集水时间、收水形式、泵站形式、工艺设计等几个关键技术难点进行了阐述,并对泵站沉井的两个关键施工问题作了探讨。
The paper introduces several key technology points such as catchment area calculation,return period choice,inlet time,collecting types,bumping station types and technology design through a practical case of Rainwater Pumping Station of Shanghai Huaxiang Rd. Subway. In the mean time,two vital construction problems about bumping station open caisson are discussed by the author.
出处
《中国市政工程》
2010年第2期37-39,共3页
China Municipal Engineering
关键词
泵站
设计
雨水
地道
华翔路
bumping station
design
rainwater
subway
Huaxiang Rd.