摘要
峨口铁矿为了解决东区采场的矿石出路问题,决定增建两条放矿明溜槽。本文简述了溜槽工程地质概况,详细介绍了溜槽的爆破成形设计方案,分析了爆破效果。
In this paper, the geological condition of the chute in the iron mine is discussed, the design program for forming the chute by blasting is also introduced, and the blasting effectiveness is analyzed.
出处
《爆破》
CSCD
1999年第1期14-19,共6页
Blasting