钢筋混凝土框~排架厂房的控制爆破拆除 被引量:2

Controlled Explosive Demolition of Workshop with the Structure of Frame-Row Reinforced Concrete
下载PDF
导出
摘要 介绍了在框~排架高大厂房的拆除爆破过程中,爆破方案的选择、参数的选取等方面的一些实践,并论述了如何在周围条件限制下,妥善处理局部保留结构,控制高大结构倒向等行之有效的技术措施,探讨了复杂环境下高大厂房定向爆破拆除的可行性。 The practice on selection of blasting plan and parameters for the explosive demolition of workshop with the structure of frame-row reinforced concrete is mainly intorduced in this paper. Under limited environmental conditions, some effective technical measures, such as how to deal with partial structure, control high structure falling direction are illustrated. Feasibility of directional blasting demolishing of high building under complex environment is discussed. It can be as a reference in similar engineering.
出处 《爆破》 CSCD 1999年第1期36-41,共6页 Blasting
关键词 钢筋混凝土 框-排架厂房 控制爆破 微差爆破 controlled blasting., millisecond blasting, explosive demolition
  • 相关文献

参考文献4

  • 1杨振声.工程爆破文集(第六集)[M].深圳:海天出版社,1997..
  • 2杨振声,工程爆破文集6,1997年
  • 3陈华腾,爆破计算手册,1991年
  • 4刘清荣,控制爆破,1986年

共引文献2

同被引文献3

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部