混凝土冬季施工必须在确保施工质量及生产安全条件下,制定具有技术可靠性和经济合理性的专项施工技术方案(措施),做好技术准备工作、生产准备工作、资源准备工作。
Concrete construction in winter must ensure that under the construction quality and production safety conditions, make special construction technology programs (measures) with technical reliability and economic vetionality, to do good technical preparation, production preparation, resource preparation.