文章介绍了岭澳二期核岛辅助管道安装质量管理的要点,并简要阐述了核岛辅助管道的安装顺序、安装技术要求等内容,希望对后续核电项目核岛辅助管道安装的质量管理起到参考作用。
This paper introduces the main points of the quality management of the installation of anxiliary pipes in Ling'Ao phase Ⅱ nuclear power plant, and illustrates in brief the installation process, the installation technical requirements, etc., which can serve as a reference for the quality management of the installation of auxiliary pipes in nuclear power plant in the following nuclear power project.