摘要
八钢1号炉底炉温度大幅升高、失控,通过加入钒钛烧结矿、堵风口、降冶强等一系列护炉措施,使炉底温度达到规定范围。
The temperature of basteel No.1 BF raising and out of control,by adopting some methods,such as put in sinter iron ore contained vanadium and titanium,plugging tugere,reducing smelting intensity etc,the temperature of basteel was recovered to rangement of regulation.
出处
《山西冶金》
CAS
2010年第2期44-45,64,共3页
Shanxi Metallurgy
关键词
钒钛烧结矿
护炉
实践
sinter iron ore contained vanadium and titanium
BF protection
protction