摘要 A Double Shear Model(DSM) was used in a numerical simulation on bolted rock joint shearing performance.An entire bolt deformed as the letter'U'under a shear load between two joints.Near the bolt-joint intersection,the bolt partly deformed as the letter'Z'.There were two critical points along the bolt:one was at the bolt-joint intersection with zero bending moment and the other at the maximum bending moment(plastic hinge) with zero shear stress.The blocks on two sides slid along the bolt as it deformed. A separation area was found between the two joint contact surfaces of the middle rock block and sided block.This area of separation was related to bolt diameter and external forces.We assume that this area is related to the work of external forces.Further research is needed. A Double Shear Model(DSM) was used in a numerical simulation on bolted rock joint shearing performance.An entire bolt deformed as the letter"U"under a shear load between two joints.Near the bolt-joint intersection,the bolt partly deformed as the letter"Z".There were two critical points along the bolt:one was at the bolt-joint intersection with zero bending moment and the other at the maximum bending moment(plastic hinge) with zero shear stress.The blocks on two sides slid along the bolt as it deformed. A separation area was found between the two joint contact surfaces of the middle rock block and sided block.This area of separation was related to bolt diameter and external forces.We assume that this area is related to the work of external forces.Further research is needed.
作者 SONG Hongwei
出处 《Mining Science and Technology》 EI CAS 2010年第3期460-465,共6页 矿业科学技术(英文版)
基金 Financial support from the National Natural Science Foundation of China(No.50978251) the National Government Building High-Level University Graduate Programs of the China Scholarship Council
  • 相关文献

参考文献5

二级参考文献21

  • 1孙晓明,何满潮.深部开采软岩巷道耦合支护数值模拟研究[J].中国矿业大学学报,2005,34(2):166-169. 被引量:263
  • 2赵庆彪,侯朝炯,马念杰.煤巷锚杆-锚索支护互补原理及其设计方法[J].中国矿业大学学报,2005,34(4):490-493. 被引量:82
  • 3张拥军,安里千,于广明,马念杰,李建辉,李怀奇,李琦.锚杆支护作用范围的数值模拟和红外探测实验研究[J].中国矿业大学学报,2006,35(4):545-548. 被引量:13
  • 4葛修润 刘建武.加锚节理面抗剪性能研究[J].岩土工程学报,1988,10(1):8-19.
  • 5宋宏伟.[D].徐州:中国矿业大学建筑工程学院,2002.
  • 6朱维申 陈卫忠 李术才.双轴压缩作用下雁型裂纹扩展机理及岩体加锚增韧的模型实验研究[R].武汉:中国科学院武汉岩土力学研究所科研报告,1995..
  • 7顾金才 明治清 沈俊 等.预应力锚索内锚固段受力特点现场试验研究.岩石力学与工程学报,1998,17:788-792.
  • 8Stillboeg B. Experimental investigation of steel cables for rock reinforcement in hard rock[PhD thesis][D]. Sweden: Lulea University of Technology, 1984.
  • 9Yoshinaka R. Evalua-on of bolt reinforcement in discontinuous rocks[A]. In: Proc of IRSM 8^th Congress on Rock Mech[C]. [s 1]:[s n], 1995, 249-252.
  • 10Jarred D J J, Haberfield C M. Tenden/grout interface performance in grouted anchors[A]. In: Grouted Anchorages and Anchored Structures[C]. London: Thomas Telford, 1997.

共引文献59

同被引文献257

引证文献18

二级引证文献143

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部