摘要
以瑞赣高速公路红砂岩路段路基填筑施工为例,根据红砂岩的工程性质提出了过程施工控制和工后控制,较好地保障了红砂岩路段路基填筑质量,并取得了较好的效果,为类似道路工程积累了经验。
Taking the roadbed filling on red sandstone along Ruijin to Ganzhou expressway as an example,according to the engineering characteristics of the red sandstone,points out the construction control and the control after the complete,guarantees the filling quality of the roadbed in the red sandstone section,and achieves better effect,so as to accumulate experience for similar road projects.