以某钢筋混凝土斜拉桥换索为例,对换索前期准备工作,施工技术及换索时段的选择及期间对交通量控制等内容进行了论述,经实践证明,该桥换索后工作性能良好,施工方便,可为同类工程参考。
With the rope substitution of one reinforced concrete diagonal cable as an example,the thesis discusses the following contents: the earlier period preparatory work,construction technologies,the selection of rope substitution time interval and traffic volume control and etc..After the rope substitution to this bridge,it was proved that the working performance was fine and construction was convenient,which could become a reference to the same kind of engineering.