某特大跨斜拉桥施工阶段主梁受力分析 被引量:2

Girder stress analysis in the construction stage of one large span cable-stayed bridge
下载PDF
导出
摘要 通过有限元软件对某436 m跨径的宽桥面双塔双索面钢—混结合梁斜拉桥施工阶段的结构受力进行了分析,计算结果表明,在双悬臂施工阶段、单悬臂施工阶段以及安装桥面系阶段,桥梁的混凝土面板和钢主梁应力均满足规范要求,说明该桥施工阶段主梁安全可靠。 By finite element software,the thesis made a structure stress analysis in construction stage to one twin-tower and steel cable-stayed bridge with a 436 metre span-diameter bridge surface.The result of the calculation showed the tensions of the concrete plane and steel girder meet the standard requirements in double-cantilever construction stage,single-cantilever construction stage and the bridge-floor system installation stage,which indicated the girder of this bridge is safe and reliable.
作者 王建新
出处 《山西建筑》 2010年第16期328-329,共2页 Shanxi Architecture
关键词 结合梁 斜拉桥 施工阶段 有限元 comprehensive girder cable-stayed bridge construction stage finite element
  • 相关文献

参考文献4

二级参考文献4

  • 1交通部.公路旧桥承载能力鉴定方法[M].北京:人民教育出版社,2004.
  • 2姚玲森.桥梁工程[M].北京:人民交通出版社,1998..
  • 3交通部科学研究所.大跨径混凝土桥梁的试验方法[M].北京:人民教育出版社,1982.
  • 4郝志强,张国兵,任秉龙.仁义河特大桥静载试验及成果分析[J].山西建筑,2008,34(30):313-314. 被引量:2

共引文献13

同被引文献6

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部