期刊文献+

煤系地层隧道整体下沉的监控量测 被引量:1

The Monitoring of the Integral Settlement of the Tunnel in the Coal Stratum
下载PDF
导出
摘要 通过具体实例判断隧道在煤系地层中存在整体下沉现象。具体监控量测方法是在隧底和拱顶布点,观察二者的下沉量是否同步,据此可以判断煤系地层中隧道是否存在整体下沉,随后的施工实践验证了量测结果及由此推断出的结论的正确性。为煤系地层隧道施工提供了一个新的施工监测方法。 With practical projects as examples,the integral settlement of the tunnel in the coal strata is studied and analyzed in the paper.To be more specific,some points for observation are located at both the top of and the bottom of the arch of the tunnel,and the settling extents of the two are compared.It is then found out whether the settlement at those two places is in step,according the result of the observation of which whether there is integral settlement in the tunnel can thus be determined,the correctness of the survey results of which is already verified by the subsequent construction and survey practice.It may serve as a new survey and monitoring method for the construction of tunnels in coal strata.
作者 方曦晨
出处 《国防交通工程与技术》 2010年第3期61-62,67,共3页 Traffic Engineering and Technology for National Defence
关键词 煤系地层 隧道 整体下沉 监控量测 coal strata tunnel integral settlement monitoring
  • 相关文献

同被引文献9

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部