1CHENG E, POLAK M A. Theoretical model for calculating pulling loads for pipes in horizontal directional drilling[J]. Tunnelling and Underground Space Technology, 2007,22: 633-643.
2BAUMERT M, ALLOUCHE E, MOORE I. Drilling fluid considerations in design of engineered horizontal directional drilling installations[C]. International Journal of Geomechanics, 2005 : 339-349.
3CURREY J, WOODBRIDGE G, DUYVESTYN G. On grade large diameter directional drilling[C]. Proceedings of North American Society and International Society for Trenchless Technology No Dig Conference, 2009.