摘要
阐述铁路工程建设中材料价差调整的内容和方法,根据合同要求和项目具体情况对价差调整诸方面进行对比,并详细分析目前铁路工程材料价差调整方法的不足,对存在的问题提出实行量价分离、据实调整等解决方法和建议。
Describing the contents and methods of adjusting the price differences in the railway construction , with examples and detailed analysis of the current railway project is expected worse problems may exist in terms of material spread adjustments proposed solution and recommendations.
出处
《铁路工程造价管理》
2010年第3期18-19,23,共3页
Railway Engineering Cost Management
关键词
铁路工程
材料价差
调整
railway engineering
price difference
adjustment