期刊文献+

石太客运专线阳泉北站房地下进站厅基础设计

Design of underground entrance hall foundation of Yangquan North Station in Shitai Passenger Dedicated Line
下载PDF
导出
摘要 综合介绍石太客运专线阳泉北站站房综合楼工程地下进站厅部分的基础设计,着重从地下进站厅基础方案的确定、条形基础加防水板设计、地下室剪力墙设计3个方面进行阐述,结合实际应用中遇到的若干问题,概括出此类建筑的若干设计要点以及实际应用中解决问题的方法,可为今后同类设计提供一些设计参考。 This article comprehensively introduces designing of underground entrance hall foundation of Yangquan North Station in Shitai Passenger Dedicated Line, and emphatically elaborates determination of engineering scheme of underground entrance hall foundation, strip foundation strengthened by waterproof board, basement shear wall design. In accordence with practical problems in the actrual application, it summerizes design essentials and solutions of similar projects, and provides some usefull references.
作者 薛丹
出处 《铁路工程造价管理》 2010年第3期24-27,38,共5页 Railway Engineering Cost Management
关键词 大型站房 地下进站厅 防水板 基础设计 large -scale station building underground entrance hall waterproof board foundation design
  • 相关文献

参考文献3

  • 1顾晓鲁.地基与基础[M](第三版).北京:中国建筑工业出版社,2005.
  • 2GB50011-2001,建筑抗震设计规范(2008年版)[S].
  • 3GB50007-2002.建筑地基基础设计规范[S].[S].,..

共引文献1875

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部