期刊文献+

工程独立坐标系的建立及与国家坐标的转换 被引量:7

Creation of engineering independent coordinate system and conversion from/to national coordinate system
下载PDF
导出
摘要 从工程实例出发论述了几个主要技术问题:为什么要建立工程独立坐标系,工程1/40 000投影变形要求所对应的投影高差限度或横坐标限度,归算高程面低于施测高程面时的高差负投影变形与高斯平面正投影变形的联合影响,以测区平均高程面或平均经度建立工程独立坐标系的坐标改算,工程独立坐标系的建立方法,工程独立坐标系与国家坐标的换算,多个工程独立坐标系的连接。 This paper introduces the reason for the creation of the engineering independent coordinate system,the projection elevation difference limits or abscissa limits according to engineering 1/40 000 project distortion requirements,the combined effects of elevation difference negative projection distortion and Gauss plane orthographic projection distortion when the reductive elevation surface is lower than the measured one,the coordinate conversion when creating the engineering independent coordinate system according to the mean elevation surface or mean longitude of the measuring area,the method for creating the engineering independent coordinate system,conversion to/from national coordinate system,and connection of engineering independent coordinate system.
出处 《水运工程》 北大核心 2010年第5期57-60,共4页 Port & Waterway Engineering
关键词 工程测量 独立坐标系 投影变形 engineering survey independent coordinate system projection distortion
  • 相关文献

参考文献2

  • 1GB50026-2007工程测量规范[S].
  • 2武汉测绘学院大地测量学教研组,大地测量学[M].北京:中国工业出版社,1964.

共引文献376

同被引文献25

引证文献7

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部