综采工作面支架快速回撤实践 被引量:12

Practice on Support Quick-withdrawing on Fully-mechanized Working Face
下载PDF
导出
摘要 赵固一矿在综采工作面支架回撤过程中,通过预掘回撤通道、回采末期在顶板铺设金属网和圆木,支架回撤期间架前铺设钢板的方法,有效解决了高矿压、破碎顶板条件下支架回撤难题,实现了支架的安全快速回撤,节省了时间,经济、社会效益显著。 In the process of support withdrawing on fully-mechanized working face in Zhaogu No.1 Coal Mine,methods of pre-excavation the withdrawing channel,pre-laying plate frame using pavement metal mesh,wire rope and logs on the roof at the end of mining,pre-laying plate in front of support during support withdrawing were used to solve the problem of support withdrawing under the conditions of high rock pressure and broken roof.Application of these methods achieved quick-withdrawing of support safely,and time was saved obviously,and had great social and economic benefits.
出处 《中州煤炭》 2010年第5期53-54,71,共3页 Zhongzhou Coal
关键词 综采工作面 破碎顶板 支架快速回撤 fully-mechanized working face broken roof quick-withdrawing of support
  • 相关文献

参考文献2

二级参考文献3

共引文献83

同被引文献53

引证文献12

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部