摘要
对华能海门电厂2×1 000MW机组的汽轮机、锅炉设备、环保设备、煤灰系统、电气仪表、土建、主厂房布置、总平面布置采取了一系列的创新优化措施,在确保机组安全运行的基础上,有效提高了机组的效率,降低了工程造价和运行费用。
A series of innovation and optimization measures were taken for the steam turbines, boiler and environmental protection equipment, coal ash system, electrical instrumentation, civil engineering, main plant building layout and general layout of two 1 000 MW units in Huaneng Haimen Power Plant, thus effectively raising unit efficiency, reducing project and operation costs on the basis of ensuring safe operation of units.
出处
《广东电力》
2010年第5期50-54,69,共6页
Guangdong Electric Power
关键词
汽轮机
锅炉
煤灰系统
电气仪表
主厂房
平面布置
steam turbine
boiler
coal ash system
electric instrument
main plant building