期刊文献+

一种现场测定土壤源热泵岩土热物性的新方法 被引量:5

A METHOD FOR MEASURING THERMAL PROPERTIES OF GROUND
下载PDF
导出
摘要 利用现有土壤源热泵实验台测定了岩土热物性参数,采用传热学反问题的方法对实验数据进行分析。测试过程中从岩土取热,U型地埋管换热器形成一个线热汇,使其在测试过程中与热泵实际运行时的工作状态相接近,测试更准确,节省测量过程的耗电量。以每个采样时刻作为计算节点,取平均值作为计算结果。测定结果显示岩土导热系数为3.2W/(m·K),回填材料导热系数为2.0W/(m·K),岩土热扩散率为0.85×10^(-6)m^2/s。可靠性分析表明:其标准误差分别为0.08W/(m·K),0.04W/(m·K)和0.039×10^(-6) m^2/s。 Thermal properties of ground have been measured by using a ground source heat pump experiment plate. The calculation is an inverse problem of heat transfer, and a method was used to solve this problem. Heat transfer in the bore hole was simplified by using the equivalent cylinder method. Heat transfer out of the bore hole was calculated by using the Ingersoll line heat source model. The heat pump extracts heat from the ground, and the U-tube acts as a heat sink. Thus, heat exchange process in the bore hole is more similar to the operating condition. Each group of sample data is used to calculate the thermal properties, and the average value is taken as the result. Thermal conductivity of ground is 3.2W/(m·K), thermal conductivity of back fill is 2.0W/(m·K), thermal diffusivity of ground is 0.85 × 10-6m2/s. Re-liability of those data are analyzed in this paper. Uncertainty degree of them are 0.08W/(m·K), 0.04W/(m·K), 0.039 ×10-6m2/s, respectively.
出处 《太阳能学报》 EI CAS CSCD 北大核心 2010年第1期22-26,共5页 Acta Energiae Solaris Sinica
基金 国家自然科学基金(NO.50676018) 教育部博士点基金项目(20050286033)
关键词 土壤源热泵 热物性参数 实验 测定 ground coupled heat pump thermal properties experiment measurement
  • 相关文献

参考文献3

二级参考文献35

  • 1高祖锟.用于供暖的土壤-水热泵系统[J].暖通空调,1995,25(4):9-12. 被引量:21
  • 2张昆峰,马芳梅,金六一,汤建华.土壤热源与热泵联接运行冬季工况的试验研究[J].华中理工大学学报,1996,24(1):23-26. 被引量:7
  • 3David R Dinse. Geothermal systems for school [J]. ASHRAE Journal, May 1997.
  • 4李家伟等.土壤源热泵的理论与实践研究[A].1995年暖通空调年会资料集[C],1 995:408~41 0.
  • 5张旭太阳能一土壤热源热泵及其相关基础理论研究[Z]:[博士研究报告].上海:同济大学,1 999.
  • 6李元旦 魏先勋.水平埋地管理地换热器夏季瞬态工况的实验及数值模拟[J].湖南大学学报:研究生专刊,1999,26(2):220-225.
  • 7William S Fleming. Ground source heat pump design and operation Experience within an Asian Country[J]. ASHRAE Transactions, 1998, Part 2: 771~774.
  • 8Ball D A, Fischer R D, Hodgett D L. Design methods for ground source heat pump. ASHRAE Transactions, 1983(2):416~440.
  • 9王补宣.王补宣论文集[C]北京:清华大学出版计.1993
  • 10V C Mei. Effect of back-filling material on ground coil performance[J]. ASHRAE Transactions, 1987, Part2:1845~1857.

共引文献135

同被引文献81

引证文献5

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部