2Coulter S L, Bras B A, Rosen D W. Formulation and Solving Paramentric Design Problems Involving Non-Interference Contrains[ J]. Engineering with Computer, 1997, (13):112- 124.
3Kim Lascola Needy, Richard E. Biilo. A Cost Model for the Evaluation of Alternative Cellular Manufacturing Configurations[J].Computers ind.Engng,1998,(34/1):119-134.
4黄慧君 朱家宁 薛恒新.CIMB环境下生产成本事中研究.当代财经,1998,(3):10-13.
5Levy PB, Smith J, Stranfileld S D. Qrganization Strategy for CIM.CIMS, 1991,4(2).