宝鸡代家湾渭河大桥主塔施工技术 被引量:4

Main Pylon Construction Techniques of Daijia Bay Weihe Bridge in Baoji City
下载PDF
导出
摘要 宝鸡代家湾渭河大桥主桥为两座单塔无背索斜拉桥,主塔设计为钻石型钢筋混凝土结构,采用整体提升模板施工。对临时支撑、劲性骨架、模板、主塔施工进行了总结,可供同类工程施工参考。 Single-column pylon cable-stayed bridge without backstays is a unique cable-stayed bridge which is developed in recent years, The inclined cable-stayed bridge and girder make a pylon and beam equilibrium system. Main pylon resists the load over girder from cable as cantilever. Structure and stress of the single-column pylon cable-stayed bridge without backstays are very complicated. The main bridge of Daijia bay Weihe bridge in Baoji city consists of two single-column pylon cable-stayed bridges without hackstays. The diamond-shaped main pylon is constructed by reinforced concrete. Also, integral lift of formwork is exercised in the construction. In this paper, the technology of temporary support, stiff skeleton, formwork, construction of main pylon is summarized, which can be used by other similar construction as reference.
作者 赵晓春
出处 《铁道建筑技术》 2010年第5期1-4,35,共5页 Railway Construction Technology
关键词 单塔无背索斜拉桥 主塔施工 模板设计 质量控制 single-column pylon cable-stayed bridge without backstays main pylon construction formwork design quality control
  • 相关文献

参考文献2

共引文献58

同被引文献26

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部