摘要
结合福州绕城高速公路西北段隧道的实际施工情况,通过对地质条件、施工方法和机械的使用要求分析,再根据施工组织设计的工程量、计划工期和作业机械的技术能力、运距等进行机械化配置。在确保隧道机械化施工组织合理、科学的基础上,实现连续、高效作业。实践表明,对类似隧道机械化系统采用规范、合理的方式进行配置是必要的。
In combination with the construction of tunnel on northwest section of Fuzhou ring expressway, the deployment of construction machinery is carried out according to the workload, planned construction period, technical capability and transport distance and so on, after the analysis on geological condition, construction technology and operational requirements of machinery. The operation is kept continuous and efficient on the basis of scientific organization. The practice indicates that it's necessary to apply reasonable mechanization system to tunnels.
出处
《筑路机械与施工机械化》
北大核心
2010年第6期70-72,共3页
Road Machinery & Construction Mechanization
基金
福州绕城公路西北段RA11合同段施工机械化研究(09KY13)
关键词
隧道
施工
机械化配置
应用
tunnel construction
mechanization deployment
application