摘要
既有技术站列车编组计划编制,与客货分线和生产布局调整等新情况有许多不适应之处。结合实际,大胆提出改进建议,为长距离开行直达、直通列车献策。
Many aspects of the current train formation plan for technical service station are unsuitable for the new situations,such as separation of freight and passenger line,adjustment of production deployment and so on. Connecting with the practice,this paper provides suggestions for improvement and offers advices for dispatching long distance non-stop or direct trains.
出处
《石家庄铁路职业技术学院学报》
2010年第2期39-41,共3页
Journal of Shijiazhuang Institute of Railway Technology
关键词
技术站
编组计划
建议
technical service station formation plan suggestion