含模糊服务水平的可控提前期供应链库存优化

Research on Supply Chain Inventory Optimization with Controllable Lead Time and Fuzzy Service Level Constraint
原文传递
导出
摘要 在文献"含服务水平约束的可控提前期供应链Stackelberg模型与协调机制研究"(管理学报,2008)的基础上,进一步将服务水平约束看作一个模糊数,进而探讨具有模糊服务水平约束的可控提前期供应链库存优化问题,并采用模糊非线性规划的方法进行求解。采用数值实验方法,对所建的库存优化模型进行了分析,结果表明:最优订货批量、提前期、供应链各方库存成本和获得该成本的隶属度水平均随对模糊服务水平弹性区间的不同主观估计变化而变化。但当模糊服务水平弹性区间增大到一定程度时,会出现服务水平约束无效的情形,则最优订货决策,库存总成本,及获得该成本的隶属度均不会再发生变化。 Based on the literature "Stackelberg Model for Controllable Lead Time Supply Chain with Service Level Constrains and Its Coordination Mechanism"(Chinese Journal of Management,2008),the service level constrain is further assumed to be a fuzzy number and a supply chain inventory optimization model with controllable lead time and fuzzy service level constraint is studied.The fuzzy non-linear programming is adopted to get the optimal solutions.The results of numerical examples show that,the optimal order quantity,optimal lead time,inventory cost of each party of supply chain and the membership function will be changed with the changes of subjective estimated value intervals of service level constraint.However,as the value intervals of service level constraint increases to be certain extent,the optimal order quantity,optimal lead time,inventory cost of each party of supply chain and the membership function will not be changed any more.
出处 《工业工程与管理》 北大核心 2010年第3期19-25,共7页 Industrial Engineering and Management
基金 国家自然科学基金资助项目(70872031) 教育部"新世纪优秀人才支持计划"资助项目(NCET-08-0212) 华南理工大学中央高校基本科研业务费资助项目(2009SM0030)
关键词 供应链 可控提前期 模糊服务水平约束 库存优化 supply chain controllable lead time fuzzy service level constraint inventory optimization
  • 相关文献

参考文献11

  • 1Tersine R J,Humingbird E A.Lead-time reduction:the search for competitive advantage[J].International Journal of Operations and Production Management,1995,15(2):8-18.
  • 2Liao C J,Shyu C H.An analytical determination of lead time with normal demand[J].International Journal of Operations and Production Management,1991,11(9):72-78.
  • 3Ben-daya M,Raouf A.Inventory models involving lead time as decision variable[J].Journal of the Operational Research Society,1994,(45):579-582.
  • 4Ouyang L Y,Yen N C,Wu K S.Mixture inventory model with backorders and lost sales for variable lead time[J].Journal of the Operational Research Society,1996,47:829-832.
  • 5Ouyang L Y,Wu K S.Mixture inventory model involving variable lead time with a service level constraint[J].Computers & Operations Research,1997,24(9):875-882.
  • 6Pan J C H,Yang J S.A study of an integrated inventory with controllable lead time[J].International Journal of Production Research,2002,40:1263-1273.
  • 7Ouyang L Y,Wu K S,Ho C H.Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time[J].International Journal of Production Economics,2004,92(3):255-266.
  • 8宋华明,马士华.二阶段供应链中提前期压缩的影响与协调[J].管理科学学报,2007,10(1):46-53. 被引量:35
  • 9李怡娜,徐学军,叶飞.允许缺货的可控提前期供应链库存优化与协调[J].工业工程与管理,2008,13(1):41-46. 被引量:8
  • 10叶飞,李怡娜.含服务水平约束的可控提前期供应链Stackelberg模型与协调机制研究[J].管理学报,2008,5(1):70-77. 被引量:6

二级参考文献47

  • 1鲁其辉,朱道立,林正华.带有快速反应策略供应链系统的补偿策略研究[J].管理科学学报,2004,7(4):14-23. 被引量:30
  • 2贺政纲,帅斌,张杰.供应链企业在各种关系下的价格折扣方案设计[J].交通运输工程与信息学报,2006,4(3):80-86. 被引量:2
  • 3Tersine R J,Hummingbird E A.Lead-time reduction:The search for competitive advantage[J].International Journal of Operations & Production Management,1995,15(2):8-18.
  • 4Mason-Jones R,Towill D R.Total cycle time compression and the agile supply chain[J].International Journal Production Economics,1999,62(1-2):61-73.
  • 5Porter A M.Unlocking leadtimes[J].Purchasing,2003,132(4):34-37.
  • 6Poole L W.Profiting from cycle time reductions[J].Hospital Materiel Management Quarterly,1997,18(4):67-71.
  • 7Lemon J M.Lead time reduction:The catalyst for world-class results[J].Hospital Materiel Management Quarterly,2000,21(4):64-68.
  • 8De-Treville S,Shapiro R D,Hameri A P.From supply chain to demand chain:The role of lead time reduction in improving demand chain performance[J].Journal of Operations Management,2004,21(6):613-627.
  • 9Gross D,Sorliano A.The effect of Reducing leadtime on inventory levels-simulation analysis[J].Management Science,1969,16(2):61-76.
  • 10Tyworth J E,Guo Y M,Ganeshan R.Inventory control under Gamma demand and random lead time[J].Journal of Business Logistics,1996,17(1):291-304.

共引文献45

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部