从平移式缆机大峡水电站应用实践,论证了缆机在水电站施工的优点及起到“举足轻重”的作用,分析了使用现状并对今后使用缆机浇筑水电站枢纽混凝土提出建设性意见。
Based on the practice of Daxia Hydropower Station, the importance of using translation cable machine in construction was shown. The situation at present and in future of using the machine to pour concrete are analyzed and predicted, on which suggestions are put forward.
出处
《陕西水力发电》
1999年第1期46-50,共5页
Journal of Shaanxi Water Power
关键词
缆机
使用分析
利用率
改进措施
三峡工程
Cable machine, Analysis of utilization, Efficiency increasing, Measures of improvement