摘要
根据贵港航运枢纽水库及水电站运行条件和综合利用要求。
Discussing the operation way of the hydropower station according to the operation conditions and requirements of comprehensive utilization of Guigang reservior and power station.
出处
《红水河》
1999年第1期38-41,共4页
Hongshui River
关键词
水电站
水库水位
运行方式
航运枢纽
hydropower station, shipping, reservoir water level,operation way, Guigang shipping hub