期刊文献+

盲孔法测定焊接残余应力适宜测试时间研究 被引量:19

On Suitable Testing Time of Blind Hole Technique for Measuring Residual Stress
下载PDF
导出
摘要 研究了盲孔法测定残余应力时应变值与测试时间的关系,结果表明对于16Mn、1Cr18Ni9Ti等材料制成的焊接构件在测试焊接残余应力时,为保证应变值的测试精度。 The influence of records taken time on the strain value with blind hole technique for measuring residual stress is studied The results obtained show that there must be a test interval at least 40 min after stopping drill to take the strain records in order to obtain suitable testing accuracy for welded components made by 16Mn or stainless steel plate under the test condition for welding residual stress testing It should be studied throughly that the influence of testing time on the accuracy of blind hole technique
出处 《武汉水利电力大学(宜昌)学报》 1999年第1期54-57,共4页
关键词 盲孔法 残余应力 焊接 测试时间 blind hole technique residual stress welding testing time
  • 相关文献

参考文献6

二级参考文献12

  • 1侯文考,陈邦固,张文钺.缝隙型焊接试件拘束应力的分析[J].焊接学报,1994,15(1):59-66. 被引量:7
  • 2王维容,焊接,1988年,3期,7页
  • 3盛世雄,X射线衍射技术,1986年
  • 4伍尚礼,全国残余应力会议交流资料,1980年
  • 5徐芝纶,弹性力学.上,1979年
  • 6钱伟长,弹性力学,1956年
  • 7萨文 G H,孔附近的应力集中,1952年
  • 8陈怀宁,1990年
  • 9黄兰林,1990年
  • 10李广铎,焊接学报,1986年,7卷,2期,87页

共引文献61

同被引文献95

引证文献19

二级引证文献119

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部