贵港航运枢纽船闸引航道回淤试验研究 被引量:2

Study on Sediment Accumulation in Lock Approach of Guigang Project
下载PDF
导出
摘要 针对少沙河流上船闸引航道泥沙淤积问题研究资料甚少的情况,采用物理模型试验方法,研究了贵港枢纽船闸引航道水流泥沙运动规律,分析了引航道淤积的机理及特点,得出了3个特征年份引航道泥沙回淤量及引航道口门区最大淤积厚度.研究表明,少沙河流上的船闸引航道淤积仍然是不可忽视的问题。 Guigang harbor is built on a river carrying a small amount of sediment.By means of physical model tests,the sediment transport law for the lock approach of Guigang harbor,the mechanism and properties of sediment accumulation are analysed,and the amount and the largest thickness of sediment accumulation in the area of the approach gateway in three kinds of typical years are obtained.It is indicated that in canalization of a river which even carries a small quantity of sediment,sediment accumulation in the lock approach should not be overlooked;and to eliminateit relevant measures must be taken.
出处 《河海大学学报(自然科学版)》 CAS CSCD 1999年第2期81-85,共5页 Journal of Hohai University(Natural Sciences)
关键词 船闸 引航道 回流 异重流 泥沙淤积 loek approach eddying water density current sediment accumulation suspended load
  • 相关文献

参考文献3

  • 1谢鉴衡 丁君松 等.河床演变及整治[M].北京:水利电力出版社,1987.224-226.
  • 2王作高,船闸设计,1992年,67页
  • 3谢鉴衡,河床演变及整治,1987年,224页

共引文献5

同被引文献13

引证文献2

二级引证文献7