低净空钢桁梁特大桥承导线架设方法

The Low Headroom Steel Truss Bridge Load and Access to Cable Lines to Set up Methods
下载PDF
导出
摘要 通过包兰线包惠段巴彦高勒至杭锦旗区间上行线三盛公黄河特大桥接触网施工的工作实践,论述对低净空钢桁梁特大桥承导线架设施工方法、注意事项的一些看法,并提出如何在架线过程中避免对线索造成硬弯、损伤、扭面等质量缺陷,以便接触网施工人员参考。 Baotou-Lanzhou line through the benefits package paragraph Bayangaole to uplink Hangjinqi range of the Yellow River san Sheng gong large net bridge construction first-hand experience,to talk about their low headroom steel truss bridge load and access to cable lines to set up construction methods,some of the attention,and how to avoid the process of wiring leads to the result of hard bends,the injuries,twisted face and other quality defects in construction in order to contact network for reference.
作者 熊秋龙
出处 《科技创业月刊》 2010年第6期158-159,共2页 Journal of Entrepreneurship in Science & Technology
关键词 低净空 钢桁梁特大桥 架线 施工方法 注意事项 Low headroom steel truss girder bridge wiring construction method note