摘要
针对新安矿六采区10号层生产过程中出现的支护技术的实际难题,科学地拟定支护方案,确定合理支架型号,并监测支护效果,总结适合新安矿六采区10号层顶板控制方法和技术经验。
To tackle the problems encountered in the supporting of the face in 10# seam in the No.6 district for ensuring mining safety,extensive work is made in this respect.Through the study,the scientific support scheme and the appropriate models of supports adaptable for use for the roof control at the face are defined.Finally,the technical experience obtained is presented.
出处
《水力采煤与管道运输》
2010年第2期14-17,共4页
Hydraulic Coal Mining & Pipeline Transportation