摘要
综合自动化变电站内部通讯组网优良是远动信息准确、稳定的前提,远动接口试验是远动信息准确可靠的保障。就综合自动化变电站远动接口时所应注意的几个问题做了简单论述,介绍了综合自动化变电站内部通讯组网时网络安装所应注意的问题,重点探讨了远动接口时如何完成遥信试验、遥测精度试验和遥控准确度试验。
In order to facilitate dynamic information to be accurate,stable and reliable,should first ensure the integrated automatic substation networking in good internal communication.Secondly,should ensure that the correct telecontrol interface tests.This paper briefly discusses concerned problem to the integrated automatic substation telecontrol interface,introduces concerned problem in network installation when internal communication networking in integrated automatic substation,focuses on how to complete the remote signal test,precision test and remote telemetry accuracy tests in telecontrol interface.
出处
《华中电力》
2010年第1期65-67,共3页
Central China Electric Power
关键词
综合自动化
变电站
远动接口
遥信试验
遥测试验
遥控试验
integrated automation
substation
telecontrol interface
remote signal test
telemetry test
remote test