摘要
针对油库输油泵站滑片泵在铁路罐车卸油过程中存在的性能快速下降,甚至不能正常工作的情况,从设计、工艺、施工、管理及维护等多个方面分析了滑片泵在运行过程中存在的问题,找到了滑片泵铁路罐车底油抽吸系统性能下降的主要原因,提出了具体的技术改造措施。
In the light of the problems of fast performance degradation of sliding vane pump during unloading operation,even unable towork, technical analysis on running process of sliding vane pump are carried out in the facets of design, technology, installation.management and maintenance.Performance degradation causes of sliding vane pump used in residual oil unloading system forrailroad tanker are discovered and special technical reform measures are presented.
出处
《油气储运》
CAS
北大核心
2010年第5期365-366,共2页
Oil & Gas Storage and Transportation
关键词
油库
滑片泵
铁路罐车
底油抽吸
系统
技术改造
tankfarm. sliding vane pump, railroad tanker system, residual oil unloading, system, technology reform