地下隧洞工程盾构施工法技术发展简介(续)
被引量:1
摘要
介绍了盾构施工法的优点和缺点,并详细阐述了各种盾构机的组成、施工范围、施工方法和技术发展。
出处
《凿岩机械气动工具》
2010年第2期5-9,共5页
Rock Drilling Machinery & Pneumatic Tools
同被引文献10
-
1曹燮明.近十年来国外金属矿地下开采技术的成就及今后发展趋向[J].国外金属矿采矿,1983(10).
-
2Chen W F. Limit analysis and soil plasticity [M]. Am sterdam .- Elsevier, 1975.
-
3Bishop A W. The use of pore-pressure coefficients in practice[J]. Geotechnique, 1954,4 ( 4 ).
-
4Aticinson J H,Potts D M. Stability of shallow tunnel in cohesionless soil[J]. Geotechnique,1977,27(2).
-
5Davis E H, Dunn M J, Mair R J, etal. The stability of shallow tunnels and underground openings in cohesive material[J]. Geotechnique, 1980,30(4).
-
6Sloan S W, Assadi A. Stability of shallow tunnels in soft ground[A]. Predictive soil mechanics: proceedings of the wroth memorial symposium[C]. 1993.
-
7Takemura J,Kimura T, Wong S F. Undrained stability of two-dimensional unlined tunnels in soft soil[A]. Proceedings of JSCE[C]. 1990.
-
8吕玺琳,王浩然,黄茂松.盾构隧道开挖面稳定极限理论研究[J].岩土工程学报,2011,33(1):57-62. 被引量:88
-
9幸江涛,向国金,文建平.软弱围岩隧道工程施工安全技术[J].技术与市场,2011,18(6):34-35. 被引量:3
-
10杨昕光,迟世春.土石坝坡抗震极限分析上限法[J].岩土力学,2013,34(3):721-726. 被引量:6
-
1安国明.地下隧洞工程盾构施工法技术发展简介(续)[J].凿岩机械气动工具,2010,36(3):26-30.
-
2安国明.地下隧洞工程盾构施工法技术发展简介(续)[J].凿岩机械气动工具,2010,36(4):20-23.
-
3安国明.地下隧洞工程盾构施工法技术发展简介[J].凿岩机械气动工具,2010,36(1):7-11. 被引量:1
-
4张晓霞.地震仪的发展简介[J].石油知识,1999(5):38-39.
-
5周奇才,崔涛,何自强,吕强.盾构施工中地质情况超前预报的雷达探测研究[J].中国工程机械学报,2006,4(3):331-334. 被引量:3
-
6陈思增.福建海洋经济发展简介[J].新经济,2014(10):69-70.
-
7张晋辉.墨西哥地震预警系统发展简介[J].国际地震动态,2015,36(11):4-5. 被引量:2
-
8杨世平.东水西调水隧洞工程地质勘察方法[J].中南水力发电,1998(2):31-34.
-
9陈亚历.隧道内控制测量的设计与精度分析[J].中国地名,2011(5):70-71.
-
10林一方.加拿大海洋高技术产业发展简介[J].全球科技经济瞭望,1998,13(4):17-18.