摘要
针对超临界直流炉高加跳闸的现象及对锅炉调整的影响,并结合丰城二期700MW机组高加跳闸的案例及处理经验总结,从理论上对超临界直流锅炉调节特性分析,从运行角度阐述大型直流炉高加跳闸的情况下为确保机组安全运行应当采取的处理措施。对减少大型机组非计划停运行具有指导作用。
Considering influence of high-plus trip and adjustment of supercritical monotube boiler,properties of supercritical monotube boiler were analyzed according to the high-plus trip case of Fengcheng second-phase 700MW.Treatments were proposed to ensure operation while high-plus trip.
出处
《江西电力》
2010年第2期41-42,47,共3页
Jiangxi Electric Power
关键词
超临界直流炉
高加跳闸
处理
supercritical monotube boiler
high-plus trip
treatment