期刊文献+

功率模块的验收测试

Acceptance Test of Power Modules
下载PDF
导出
摘要 雷达固态发射机单元大量使用功率模块,其具有用量大、品种多、技术指标高、测试复杂等特点,合格的单元模块对实现分系统乃至整机的性能具有十分重要的意义,规范验收测试流程,可从源头保证产品质量。文中从实际测试验收角度对验收测试的资料、系统、流程及误差等几方面进行了论述并作了有益的探讨。 There are plenty varieties of solid-state power modules widely used in radar system. These modules are of high guideline and the test procedure is complex. The quality control of these modules in check and accept procedure is of great importance. The canonical check and accept test insures the quality of the produces. In this article,the literature,system,procedure and error analysis of check and accept test are discussed in the aspect of practical work.
作者 张磊
出处 《信息化研究》 2010年第5期55-57,共3页 INFORMATIZATION RESEARCH
关键词 功率模块 测试 误差分析 power modules test error analysis
  • 相关文献

参考文献3

  • 1CHANG K.Microwave solid-state circuits and applications[M].New York:John Wiley & Sons Inc,1994.
  • 2MATTHEW M R.Radio frequency and microwave electronics illustrated[M].USA:California State University,2001.
  • 3BAHL I,BHARTIA P.Microwave solid state circuit design[M].New York:John Wiley & Sons Inc,1988.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部