期刊文献+

三峡工程对长江口南汇边滩近期演变影响初步预测 被引量:13

Preliminary Prediction on Recent Topography Evolution of Nanhui Tidal Flat in Yangtze Estuary due to Three Gorges Project
下载PDF
导出
摘要 利用DELFT3D模型建立了长江口二维泥沙数学模型,通过实测水文泥沙资料对模型进行了验证.在此基础上,分别将上游洪、枯季流量概化和外海典型潮波组合,建立了长期冲淤模型.通过10年实测地形资料对模型进行的验证,显示该模型较好地模拟了长江口水沙运动以及长期冲淤演变过程.考虑三峡工程蓄水后上游来水来沙的变化,对近期南汇边滩的演变趋势给出预测,结果显示:三峡工程实施之后的5~20年,南汇边滩发育基本稳定,上游来沙量的减少不会造成大幅度冲刷,边滩整体继续向东南方向演变. A 2D numerical model is built to simulate the sediment transport process in the Yangtze estuary by DELFT3D model at first.Then a morphological model is built with generalized flux process in the flood and dry seasons combined with the variation of tidal ranges at outer sea for a long-period simulation of the evolution of tidal flat.The model is validated through the surveyed data and the simulation result presents a good agreement with the real measured value.Further more,a prediction of the evolution process of Nanhui tidal flat is given under the impact of the Three Gorges Project.In general,there’s still a stable development of Nanhui tidal flat and expanding to the southeast without significant erosion caused by the reduction of water-sediment from the upstream in the next 5 to 20 years after the Three Gorge reservoir’s operation.
出处 《同济大学学报(自然科学版)》 EI CAS CSCD 北大核心 2010年第5期679-684,共6页 Journal of Tongji University:Natural Science
基金 上海市908资助项目(PJ4) "十一五"国家科技支撑计划资助项目(2008BAJ08B14) 科技部科技基础性工作专项重点研究项目资助(2007FY110300-03)
关键词 南汇边滩 三峡工程 冲淤模型 数值模拟 Nanhui tidal flat the three gorges project morphological model numerical simulation
  • 相关文献

参考文献17

二级参考文献56

共引文献258

同被引文献209

引证文献13

二级引证文献61

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部