创优工程资料的编制与管理 被引量:7

ESTABLISHMENT AND MANAGEMENT OF EXCELLENCE-CREATING ENGINEERING DATA
下载PDF
导出
摘要 广州国际体育演艺中心是2010年广州亚运会的重点场馆工程,其规模大,工期紧,构造复杂,专业分包(土建、钢结构、屋面、机电、消防、照明、幕墙、装修、室外工程等)众多,交叉作业多,且由两家集团跨地域联合施工,工程资料编制和收集整理难度大。总承包部制定并实施了一系列严谨完善、切实可行的工程资料管理措施,满足了创优工程的需要。 Guangzhou International Sports and Entertainment Center is an important gymnasium engineering of Guangzhou Asian Games 2010, with large scale, tight construction schedule, complex structure, a large number of discipline subcontracts (such as civil construction, steel structure, roof, electromechanical, firefight- ing, lighting, curtain wall, decoration and outdoor engineering, etc.), multiple cross works and joint construc- tion by two group companies at different areas. So there are great difficulties in establishment, collection and management of engineering data. General contract department established and implemented a series of precise, complete and feasible engineering data management measures, and the requirements of excellence-creating engineering are satisfied.
出处 《建筑技术》 北大核心 2010年第6期516-518,共3页 Architecture Technology
关键词 工程资料 创优工程 管理措施 engineering data excellence-creating engineering management measure
  • 相关文献

参考文献3

  • 1北京市建设委员会.DBJ01-51-2003,建设工程资料管理规程[S].2003.
  • 2广东省建设厅.广东省建筑工程竣工验收技术资料统一用表[K].北京:中国建筑工程出版社.2003.
  • 3GB20204--2002,混凝土结构工程施工质量验收规范[S].北京:中国建筑工业出版社,2002.

同被引文献22

引证文献7

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部