摘要 某高校的7层框架结构办公教学综合楼因新规划需整体移位,在该工程移位方案设计中,针对工程体型狭长且纵向移位的特点,通过独特的基础设计、采用"前拉后推、沿全长施力"的施力体系、严格的沉降差控制、有效的同步监测及防振措施等保障了工程的安全进行。 According to the new planning, the 7-storey general building adopting frame structure in an academy will be displaced as a whole. Considering that the general building is long and it will be displaced longitudinally, the safe engineering construction is guaranteed by adopting a series of measures, such as special foundation design, force application system of "pull at the front and push at the back, apply force along the full length", strict control on settlement difference, effective synchronous monitor and vibration-proof measure.
出处 《建筑技术》 北大核心 2010年第6期542-544,共3页 Architecture Technology
关键词 整体移位 托换加固体系 伸缩缝 whole displacement strengthening system exchange by supporting expansion joint
  • 相关文献

参考文献3

二级参考文献8

共引文献1802

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部