摘要
把建筑分包商的选择分为两个阶段,包括预选择阶段和决策选择阶段,并分别建立了两个阶段的评价准则体系.然后,基于群决策模糊聚类、群决策模糊神经网络两种模型和方法,给出了建筑分包商预选择和决策选择的具体实施步骤.最后的实证分析表明,对于建筑分包商的选择,该选择过程是实用和有效的.
Construction subcontractor selection in this paper is divided into two steps: pre- qualification and decision selection, then evaluation index systems for two steps are developed. We present the selection progresses for two steps based on fuzzy duster analysis and fuzzy neural network of group decision. The final substantiation analysis indicates that the selection progress is available and effective to selection of construction subcontractor.
出处
《数学的实践与认识》
CSCD
北大核心
2010年第11期10-19,共10页
Mathematics in Practice and Theory
基金
华北水利水电学院青年科研基金(HSQJ2006015)
华北水利水电学院高层次人才科研启动项目(200824)
关键词
建筑分包商
选择过程
群决策
模糊聚类
模糊神经网络
construction subcontractor
selection progress
group decision
fuzzy cluster fuzzy neural network.