结合宝龙巷小区管道支架的制作安装工作,对管道支架制作安装的原则加以简述,并简要说明优化设计的必要性,指出通过对机电专业管道支架的优化设计,使设备管道安装达到了良好的效果,并促进了施工安装的进度。
Combining with manufacture and installation of pipe scaffold in Baolong project,it briefly describes the principles of manufacture and installation of pipe scaffold,elaborates the needly for optimal design.Through the optimization of design on mechanical and electrical professional pipe scaffold,equipment and pipe installation attains to good results,and promotes the construction and installation progress.
出处
《山西建筑》
2010年第17期163-164,共2页
Shanxi Architecture
关键词
管道支架
制作安装
原则
优化设计
pipe scaffold
manufacture and installation
principle
optimal design