摘要
针对南岸干渠工程所在地湿陷性黄土的特性,进行了预浸水试验,通过对湿陷性黄土渠道预浸水耗水量理论计算试验耗水量、实际耗水量进行分析比较,得出相关结论,指出采取理论与实际相结合的方式,以保证耗水量计算的准确性。
Aiming at the southern bank main canal engineering located in collapsible loess characteristics,the pre-inundation test was carried out,through calculation comparison of theoretical calculation test water consumption and practical water consumption of collapsible main canal water consumption,the related conclusion was obtained.It pointed out that the method combined with theory and practice can guarantee water consumption calculation accurate.