期刊文献+

露天铁矿采空区综合探测方法研究与应用 被引量:20

The Study of Integrated Detection Method to the Mined-out Areas in Open Pit Iron Mine and its Application
下载PDF
导出
摘要 综合运用高密度电阻率法和地震映像法对露天铁矿采空区进行探测,并对探测结果进行分析对比,弥补了单一高密度电阻率法存在探测盲区、易受干扰和单一地震映像法定位复杂的缺点,准确推测出露天铁矿生产区域地下40m范围内空区的分布特征,解决了露天铁矿地下采空区探测的难题。运用该方法,在本区域内共探测出空区3处,并划定其展布范围,为矿山的治理工作提供了可靠依据。 The high density electric resistivity method and the seismic imaging method were adopted to detect the mined-out areas of open pit iron mine,and then the results of detection are analyzed and contrasted,which will make up the disadvantages of this method,like blind detecting spot of the high density electrical method,easily being influenced,and difficult to position by the seismic imaging method.This method accurately predicted the distribution feature of the mined-out areas under the ground about 40 meters,and solves the detecting problem of the underground mined-out areas in open pit iron mine.By this way,three mined-out areas were found in this region,and the distribution range is given.All of these provide a reliable basis for management of the mined-out areas.
出处 《金属矿山》 CAS 北大核心 2010年第5期124-127,共4页 Metal Mine
基金 教育部新教师基金项目(编号:20070145115)
关键词 高密度电阻率法 地震映像法 综合探测 采空区 露天铁矿 The high density electric resistivity method The seismic imaging method Integrated detection Mined-out areas Open pit iron mine
  • 相关文献

参考文献16

二级参考文献51

共引文献329

同被引文献166

引证文献20

二级引证文献112

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部