本文用模拟的方法来确定连续采煤机房柱式工作面的生产能力,提供了最优煤房尺寸。可为矿井和采区设计提供依据。
This paper determines the production capacity of the room-and-pillar working faces with continuous miner using simulation method, presents the optimal room dimensions and provides the basis for the design of coal mines and mining distriets.