洁净手术室净化空调系统施工,历经前期净化空调方案的论证,经济效益和费用的评价,方案批准后的深化设计,实施阶段的安装和中间验收,最后到达系统调试和综合性能检测阶段。为把方案、安装阶段的优势转化为合乎规范要求的工程综合性能检测指标,必须对净化空调系统调试工作进行深入策划,制定可靠的路线图,按图索骥,严格执行调试流程规范,才能取得洁净手术室建设的丰硕成果。
Clean operating room purify air-conditioning system construction, with the demonstration of prophase purify air conditioning scheme, economic benefits and cost assessment, detailed design after plan approved, installation and intermediate acceptance during the implementation phase, Finally arrived in system debug and comprehensive performance testing phase. In order to change the scheme, the advantages of installation phase into project comprehensive performance test indicators normally, we must thorough plan purify air-conditioning system debug work, make a reliable road map, looking for a steed with the aid of its picture, strictly enforce the debugging process standards, it can be achieved achievements for clean operating room.
出处
《中国医院建筑与装备》
2010年第6期61-64,共4页
Chinese Hospital Architecture & Equipment
关键词
洁净手术室
净化空调
单机试运转
联合试运行
加湿
除湿
Clean operating room Purify air-conditioning Trial run of unit machine Union corn missioning Humidification Dehumidification