摘要
结合南京市浦口区珠江污水处理厂工程,介绍了污水处理厂在工程建设上需要考虑的因素,以及污水处理系统主要处理单元和控制系统的设计,总结了该污水处理厂在设计上所具有的优点,这给其他污水处理厂在如何投入建设和进行系统设计上提供了一种思路。
Based on the project of Zhujiang sewage disposal factory at Pukou district in Nanjing city,it introduces many kinds of factors which need to be considered in the project construction of sewage disposal factory and some design methods of primary disposal units and control system.It also summaries that this factory has some technical advantages on design,this provides a kind of thinking method on construction and system design for other sewage disposal factories.
出处
《工业仪表与自动化装置》
2010年第3期74-76,共3页
Industrial Instrumentation & Automation
关键词
CAST处理工艺
预处理
曝气
溶解氧
CAST disposal craft
pretreatment
aerating
dissolved oxygen