摘要 工后沉降控制是京沪高速铁路路基工程设计最核心的问题。针对京沪高速铁路徐州至上海段路基工程的特点,在分析沉降控制设计关键技术问题的基础上,提出适宜的工后沉降分析方法及主要沉降控制设计方案:采用CFG桩、预应力管桩及桩板结构等进行加固。经现场施工及典型工点的沉降观测、评估,验证了其可靠性、合理性,满足了铺设CRTSⅡ型板式无砟轨道要求。 Post-construction settlement control is the key problem in subgrade engineering design of Beijing-Shanghai High Speed Railway.According to the characteristics of Xuzhou-Shanghai Section subgrade engineering in Beijing-Shanghai High Speed Railway,based on analysis of settlement control key technique,this paper puts forward a proper analysis method for post-construction settlement and the main control design program,i.e.reinforcement with CFG pile,prestressed pipe pile and pile-slab structure.Through observation and evaluation of typical point settlement in site construction,it is verified reliable and reasonable,which satisfies the requirement for paving CRTSⅡ type slab ballastless track.
作者 李丹
出处 《路基工程》 2010年第3期195-197,共3页 Subgrade Engineering
关键词 京沪高速铁路 路基工程 工后沉降 实测沉降 CRTSⅡ Beijing-Shanghai High-speed Railway subgrade engineering post-construction settlement measured settlement CRTSⅡ
  • 相关文献

参考文献8

  • 1中华人民共和国行业标准.新建时速300-350公里客运专线铁路设计暂行规定(上)[S].北京:中国铁道出版社,2007.
  • 2中华人民共和国行业标准.新建时速300-350公里客运专线铁路设计暂行规定(下)[S].北京:中国铁道出版社,2007.
  • 3中华人民共和国行业标准.客运专线铁路无砟轨道铺设条件评估技术指南[S].北京:中国铁道出版社,2006.
  • 4铁道第四勘察设计院.高速铁路软土地基沉降控制试验研究报告[R].2005.
  • 5中铁第四勘察设计院集团有限公司,等.京沪高速铁路CFG桩复合地基综合技术研究报告[R].2009.
  • 6雷向锋.CFG桩施工质量控制技术[J].路基工程,2007(5):133-134. 被引量:6
  • 7汤晓光,赵双林,郑文军.武广客运专线CFG桩施工方法试验研究[J].路基工程,2007(4):117-118. 被引量:10
  • 8.GB50007-2002建筑地基基础设计规范[S].北京:中国建筑工业出版社,2002..