注浆加固工法在齐岳山隧道F11断层施工中研究与应用 被引量:5

Study and Application of Grouting Reinforcement Technology in Coping with F11 Fault of Qiyueshan Tunnel
下载PDF
导出
摘要 在应对齐岳山隧道F11高压富水断层施工中,综合国内外类似地层的施工方法进行比较,拟采用注浆工法进行堵水加固施工处理,由于采用全断面超前预注浆工期长的缺点,在钻孔注浆方案设计过程,根据实际地质情况,大胆进行理论创新,将原帷幕注浆"柱状加固模式",优化为"桶状加固模式",在保证效果的前提下,减少工程数量,并在后续施工中推广应用,最终形成以封堵较大裂隙水和加固围岩为主要目的的围岩加固注浆模式,大大地缩短了施工工期。 In order to cope with F11 fault of Qiyueshan tunnel, freezing method and full-face curtain grouting method can be used. Unfortunately, both of the two methods have the disadvantage of long reinforcement period. The earlier tunneling-through of Qiyueshan tunnel, which is one of the control works of Yichang-Wanzhou Railway, means that Yichang-Wanzhou Railway can be put into operation earlier. Thus, the reinforcement period is one of the most important indexes in the selection of the proper reinforcement method. The original " column shape reinforcement mode" of curtain grouting is optimized into " bucket shape reinforcement mode". Due to the continuous technological optimization, the grouting mode aimed at sealing large fissure water and reinforcing the rock mass are developed and the reinforcement period is shortened.
作者 董裕国
出处 《隧道建设》 2010年第3期276-280,共5页 Tunnel Construction
关键词 注浆加固 齐岳山隧道 高压富水 断层 帷幕注浆 grouting reinforcement Qiyueshan tunnel high pressure and rich water fault curtain grouting
  • 相关文献

参考文献7

二级参考文献29

共引文献223

同被引文献30

引证文献5

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部