摘要
各矿都在总结综采过断层工作面形态控制原则,但都没有形成经验和理论。综采放顶煤工作面过断层的速度和效益关键在于如何把握最佳的工作面形态,本文是在结合梨树煤矿生产实践基础之上,针对综采过断层工作面形态控制原则问题进行研究。
The mines summarize the shape control principle of passing through fault in fully mechanized coal mining face,but have not formed the experience and theory.The key of the speed and efficiency of passing through the fault in fully mechanized caving coal face is how to grasp the best shape of the face,this article combines production practices of Lishu coal mine,in connection with the shape control principle of passing through fault in fully mechanized coal mining face,carries out the research.
出处
《山西焦煤科技》
2010年第5期8-10,共3页
Shanxi Coking Coal Science & Technology
关键词
综采
断层
形态控制
Fully mechanized mining
Fault
Shape control